Introducing a case where annual electricity consumption was reduced by 30-40% and carbon dioxide emissions were also reduced by about 25%.
We would like to introduce a case study of the energy plant implemented at the Pinellas County Central Energy Plant.
The air conditioning systems installed in seven county buildings in Pinellas County had exceeded their useful life and were operating inefficiently, making replacement difficult.
The newly established plant provides low-cost air conditioning to five county buildings and nearby high-rise apartments through piped water.
【Case Overview】
■Challenges
- Exceeded useful life and operating inefficiently
- Many aging units are located underground in the buildings, making replacement difficult
■Results
- Improved efficiency and reduced energy costs
- Optimization of system operations
*For more details, please refer to the related links or feel free to contact us.